The Other Test Your Contract Requires

PV Availability Testing, Built for Handover

The availability test your EPC contract requires at substantial completion — run as a guided, auditable workflow, not a hand-built spreadsheet.

  • Configured to your contract — thresholds, exclusions, guaranteed percentage
  • Per-inverter, minute-by-minute accounting
  • Never reports a pass on incomplete data
Talk to the Founder
Peter, founder of HelioTest

30 minutes with Peter — PV engineer 10+ yrs C&I solar.

Let's talk about your test procedure, no commitment.

Per-inverter availability heatmap for a five-day test — eighteen inverters by day, showing operational time, charged downtime, an excluded event, and ineligible time, with a 98.76% result against a 99.00% guarantee
Every inverter, every interval — with the result against your guarantee.

Capacity Test vs. Availability Test

Most EPC contracts require two tests at substantial completion: a capacity test proving the plant makes the promised power, and an availability test proving it was running when it should have been. They answer different questions, with different methods and different data.

Capacity Test Availability Test
Question answeredDoes it make the promised power? Was it running when it should have been?
MethodASTM E2848 regression at reporting conditions Your contract's definition of uptime in eligible hours
Typical pass criterionAt or above the agreed capacity ratio 98–99% over consecutive test days
Input dataPower, irradiance, weather, plus a PVsyst model Inverter power & status, irradiance, export — no model

A Dashboard Uptime Number Won't Settle It

Monitoring platforms report a generic uptime. Your contract defines availability its own way — HelioTest computes the number your contract actually specifies, and shows its work for every minute.

Irradiance threshold

The clock runs only above the threshold your test procedure defines.

Export threshold

Intervals count only while the plant exports above a set threshold.

Inverter status classification

Editable code table — printed in the report for sign-off.

Charging policy

Actual measured downtime, or a fixed response window per failure.

Exclusions as documented events

Outages remove time, excusals waive charges, corrections need justification.

Missing data can't inflate the result

Gaps count against availability unless documented.

Four Steps from Data to Verdict

1

Configure the Test

Eligibility rules, inverters, status-code classification, and the guaranteed percentage from your contract.

2

Upload Measured Data

Inverter power and status, irradiance, and meter export as CSV — the exports you already have.

3

Log Events

Record grid outages, excused downtime, and data corrections — every event's effect is quantified.

4

Run & Report

The verdict with its margin against the guaranteed percentage.

What You Hand Over at Substantial Completion

Availability test report (PDF)
Minute-by-minute audit table
Excel calculator with live formulas
Live project access

The report prints the contract settings and the event log the result was computed from, so a reviewer can follow the number back to the measured data.

See What the Report Looks Like

Preview of a sample PV availability test report generated with HelioTest — title page with the pass verdict and summary page
Download the Sample Report
Eight pages, free, no sign-up. Wondering how it differs from the capacity test? Read the comparison →

Two Ways to Run Your Availability Test

Run It Yourself

Enter your contract's definitions once, upload your exports, log the events, and generate the report — all through the HelioTest platform.

Best for: teams who hand over projects regularly and want the same test procedure applied every time.

Explore a pre-loaded demo instantly.

Have Us Run It

Send us your data and your test procedure. We configure the test, QA the result, and deliver the full package — with live access to the project throughout.

Best for: teams facing a handover deadline without an in-house availability procedure.

Learn About Managed Service

Frequently Asked Questions

An availability test demonstrates that a plant's equipment — typically its inverters — was operational during the hours it should have been producing. Time only counts when conditions are eligible: irradiance above an agreed threshold and the plant exporting. Many EPC contracts require an availability test at substantial completion, commonly with a guaranteed availability of 98–99% or higher over a set number of consecutive days. Availability guarantees also appear in O&M contracts.

No. IEC TS 63019 provides an information model and IEC TS 61724-3 an energy-based evaluation framework, but neither prescribes a single formula — and real contracts define availability in materially different ways, with different thresholds, exclusions, and measurement boundaries. That is why HelioTest treats your contract's definitions as explicit, configurable settings instead of claiming a one-size-fits-all standard.

Inverter AC power, plane-of-array irradiance, and meter export power as timeseries CSV exports — plus inverter status codes if your data source provides them (recommended, since status codes give the most accurate classification). No PVsyst model or energy simulation is needed.

Through a documented event log. Grid outages remove intervals from the test and extend the window to compensate. Excused events waive charging for downtime that is not the contractor's responsibility. Data corrections require a written justification. Every event's effect is quantified in the report, and downtime with no documented cause is flagged rather than hidden.

Missing data during eligible time counts against availability unless a documented correction explains it — the conservative reading, so gaps can never silently improve the result. Quality checks flag how much of the result rests on missing data, and if the data does not cover the whole test window the run is marked provisional instead of passed.

Yes. The managed service runs availability tests as an add-on to a capacity test engagement or standalone — you receive the full deliverable package and keep live access to the project. Learn more about the managed testing service.

Run Both Handover Tests on One Platform

Run the availability test yourself, or have us handle it alongside your capacity test.